The integration
in CLH's system permits that the PLC's configuration parameters
can be changed from manager's work station, and also PLC's controlled
signal can be displayed in the CLH's system OS, by the same way
some signal's historics can be generated. Communications with
PLC are managed by a communications program via IMS's IOLAN. This
program does the connection with PLC (via communications protocol),
loads the PLC's configuration initially, specifies the number
of pumps, tanks, signals that internal generic program will work
with. The whole system is adaptable to the differents airports
(Madrid, Malaga and Barcelona), by only changing configuration
parameters.
The signals are regitered in IMS's Oracle database
to process historics magnitudes.
|